Deir ez-Zor province begins constructing a second metal bridge opening from the opposite side of the city, with a length of 39 meters.

The province mentioned that the supplies and equipment were brought from the bridge battalion in the city of Al-Rastan, indicating that this step was taken as a temporary solution until the repair of the Al-Siyasiya bridge, which is considered the main bridge between the two sides of the river.